20 lines
542 B
Scheme
20 lines
542 B
Scheme
|
;; (slope in)
|
||
|
|
||
|
;; slope of signal. Measures the rate of change per second of a
|
||
|
;; signal. Formula implemented is:
|
||
|
|
||
|
;; out[i] = (in[i] - in[i-1]) * sampling_rate
|
||
|
|
||
|
;; in - input signal to measure.
|
||
|
|
||
|
;; a = quadratic noise, b = first derivative line segments, c = second
|
||
|
;; derivative constant segments
|
||
|
|
||
|
(let* ((r 2)
|
||
|
(a (lf-noise2 kr r))
|
||
|
(scale (recip r))
|
||
|
(b (mul (slope a) scale))
|
||
|
(c (mul (slope b) (squared scale)))
|
||
|
(o (sin-osc ar (mul-add (mce3 a b c) 220 220) 0)))
|
||
|
(audition (out 0 (mix (mul o 1/3)))))
|